Today we will show you how the delicious potato chips are processed. The factory uses an automatic potato chip production line. The main process is divided into peeling, peeling, slicing/slicing, dipping, dehydration, frying, deoiling, mixing, cooling, and packaging.

Some wonderful pictures of the potato into potato chips process:

Potatoes enter the production line and begin their journey into potato chips;

The potatoes are dropped into the drinking trough and the potatoes are washed;

Potatoes enter the peeling machine, which does not have a blade, but can peel potatoes. Its working principle is: the inside of the cylinder of the peeling machine is similar to sandpaper. When the machine rotates, the potatoes fly to the inside of the cylinder, so that the potato skin is worn away;

Potato peeler. The spray head above the machine flushes away the ground potato skins;

The potatoes enter the slicer, and the potatoes are cut into potato chips of an appropriate size;

Potato slicer. After the potatoes enter the slicer from the feed port because the machine is rotating, the potatoes fly to the blade on the inner wall under the action of centrifugal force, and these potatoes are cut into potato chips;

The potato chips enter the washing pool and are washed four times repeatedly. The purpose is to wash away the starch, and then the potato chips are quickly blown to dry.

Potato chips are fried in a frying pan and then degreased;

Add potato chips and add some condiments and condiments to mix evenly, so there are different potato chip flavors;

The potato chip packing and filling integrated machine packs potato chips in equal amounts, and quickly fills with nitrogen during packaging, in order to prevent the potato chips from being crushed and crushed during transportation.